Category: Newsletter Issue

  • BE Newsletter Issue #24 13 December 2018

    BE Newsletter Issue #24 13 December 2018 Inside this issue: Editorial – Lars Jensen, Accidentologie dans BE – L.F. Andre (BE-ASR), PS beam loss reduction by barrier buckets – M Vadai (BE-RF), Directory Service in the Controls Middleware (CMW) infrastructure – K. Kaczkowski (BE-CO), Identification of instability sources in PSB and LEIR – E. Koukovini-Platia

    Explore →

  • BE Newsletter Issue #23 20 November 2018

    BE Newsletter Issue #23 20 November 2018 Inside this issue: Editorial – Lars Jensen, A look towards future accelerators – M. Lamont BE-HDO, High performance computing for beam simulations – G. Rumolo et al, BGI instrument for the PS machine – J. Storey et al

    Explore →

  • BE Newsletter Issue #22 22 October 2018

    BE Newsletter Issue #22 22 October 2018 Inside this issue: Editorial – Lars Jensen, Kiosks for printing visitor badges – P. Martel, R. Nunes and T. Riesco BE-ICS, Welcoming new arrivals in the Beams Department – J. Kotzian BE-HDO, Planning Manager and Dashboard – T. Hesselberg and E. Matli BE-OP

    Explore →

  • BE Newsletter Issue #21 10 September 2018

    BE Newsletter Issue #21 10 September 2018 Inside this issue: Editorial – Lars Jensen, Waste Heat Recovery at CERN – Matias Peljo and Brad Schofield BE-ICS, Mon voyage aux USA – Aurelie Goldblatt, Improvement of Safety Awareness for CERN Beam Facilities – Dario Carloni and Marc Tavlet, First Beam Dynamics Results from SPS Crab Cavities

    Explore →

  • BE Newsletter Issue #20 14 June 2018

    BE Newsletter Issue #20 14 June 2018 Editorial – L. Jensen, Safety management for extended projects – C. Gaignant, G. Rumolo et al, Accelerator Schedule Management – B. Urbaniec, Scintillating fibre beam monitor – I. Ortega Ruiz, Trainees in the BE Department – J. Kotzian, Reminder of deadlines, BE news-letter contacts.

    Explore →

  • BE Newsletter Issue #19 12 May 2018

    BE Newsletter Issue #19 12 May 2018 Inside this issue: Editorial – L. Jensen, The HL-LHC crab cavities – G. Vandoni et al, My work as BE DAO – J. Kotzian, Diamond BLMs for LHC collimation – C. Xu et al, LINAC4 from commissioning to reliability and beam quality run – A. Lombardi et al, "Flip-dot"

    Explore →

  • BE Newsletter Issue #18 12 March 2018

    BE Newsletter Issue #18 12 March 2018 Inside this issue: Introduction – Paul Collier; Editorial – Lars Jensen, The HL-LHC Collimation System and the Impedance Challenge – S. Antipov et al BE-ABP; Re-cabling for injectors – S. Easton BE-OP; Teaching a semester in Africa – U. Raich BE-BI; Distributed I/O Tier and radiation-tolerant Fieldbus –

    Explore →

  • BE Newsletter Issue #17 December 2016

    BE Newsletter Issue #17 December 2016 Inside this issue: Editorial – Ronny Billen My Work Experience at CERN as a Student Trainee – Gerda Powell, Summer Trainee 2015 BE-BI Communication and Informatics for Controls – Fernando Varela, BE-ICS Controls Configuration Service – a challenge in usability – Lukasz Burdzanowski, BE-CO Pushing LEIR limits to new

    Explore →

  • BE Newsletter Issue #16 May 2016

    BE Newsletter Issue #16 May 2016 Inside this issue: Editorial – Ronny Billen SCADA and Distributed systems – Manuel Gonzalez Berges, BE-ICS-SDS Update on the status of the HIE-Isolde Project – Erwin Siesling, Jose Alberto Rodriguez, BE-OP-ISO PSB brightness curve for LHC beams in the Linac4 era – Elena Benedetto, V. Forte, BE-ABP-HSI, G.P. Di

    Explore →

  • BE Newsletter Issue #15 December 2015

    BE Newsletter Issue #15 December 2015 Inside this issue: Editorial – Ronny Billen The PS to SPS Multi-Turn Extraction (MTE): ready for 2016! – Simone Gilardoni, Massimo Giovannozzi, Cedric Hernalsteens, Alexander Huschauer and Guido Sterbini on behalf of the BE-ABP team, – PSB-OP, PS-OP, and SPS-OP teams Gis Portal Racks – Olivier Barrière, BE-CO-IN Electron

    Explore →